Free template

A free quote template with options and a line to sign.

A quote template for a fixed-price job: the scope, up to three options with the one you recommend marked, what's included and what isn't, a valid-until date, the deposit, and the customer's acceptance. Fill it in on this page, print it, download it for Word or Pages, or send the live version and get it signed and paid on the spot.

A quote is a promise. You've seen the job, the scope is settled, and this is the price you'll do it for until the date on the page. When the customer accepts it, you both have a contract. That's what makes a quote different from an estimate, and it's why a quote template needs things an estimate doesn't: a defined scope, a validity date, terms, and a signature.

This one is built for the way the trades sell a project: a new system, a panel upgrade, a repipe, an exterior repaint. Fill it in below, go through it with the customer, and either print it or send the live version from the bottom of the page.

What a quote has to say

  • The scope, by area. What you're doing and where: "Replace the 3-ton condenser and air handler, new pad, new line set, reconnect to the existing ductwork." One line per thing, grouped by room or system when the job is big enough to need it.
  • Options, if you offer them. Good, better, best, each a complete job at its own price, with the one you recommend marked. Three choices sell better than one because the customer is choosing between your options instead of between you and the next shop.
  • What's included in every option. Permits, haul-away, the startup and test, the warranty. The things a customer would assume and might not get elsewhere.
  • What's not. Electrical by another trade, drywall repair, anything found once the work is open.
  • The price, the deposit, and when the rest is due. Fixed, with tax, with the deposit that gets it on the calendar and the balance on completion or by milestone for longer jobs.
  • Valid until, the terms, and the acceptance. The date the price holds, how changes are handled, your state's notices, and where the customer signs.

Options sell the job

A single price invites a single question: can you do it cheaper? Three options change the question to which one. The good option is the minimum that fixes the problem and meets code. The better one adds the things you'd want in your own house: the higher-efficiency unit, the better thermostat, the longer warranty. The best is the full version. Mark the one you'd pick and say why in one sentence.

Price the options honestly, with real gaps between them. If the better option is $400 more for a thermostat the customer could buy for $200, they'll notice. If it's the difference between a 14 and a 17 SEER system with the rebate math on the page, they'll pick it more often than you'd expect. And keep the good option a job you'd be glad to do, not a decoy; some customers will choose it, and they're still your customers.

Valid until, and why it matters

Equipment prices change, and a quote with no end date is a quote you can be held to in a year. Thirty days is the usual term for a project quote; shorter if you're quoting during a price run. Write the actual date. The date also sets the follow-up: a text a week before it expires asking whether they'd like to hold a start date is the most natural follow-up there is, and it works.

Once accepted, the price is fixed for the scope on the page. Anything outside the scope is a change order: written, priced, approved before the work. Say that in the terms so the conversation on the day is "here's the change order," not an argument about what was included.

The terms a quote needs

Keep them short and in plain words. The ones that matter for a service business:

  • Payment. The deposit on acceptance, the balance on completion, or a schedule by milestone for jobs that run more than a few days. Card, check, or a link.
  • Changes. Any change to the scope is priced and approved in writing before the work.
  • Schedule. A start window, not a date, and what happens if the customer isn't ready.
  • Warranty. What you warrant on labor and for how long; parts per the manufacturer.
  • Cancellation. Your state's notice. The FTC's cooling-off rule (16 CFR part 429) gives a customer three business days to cancel most sales made at their home over $25, and you have to tell them in writing. California requires a written home-improvement contract above $500 with specific contents; New York, New Jersey, Pennsylvania and others have acts of their own. Put the required language in the notices block and your license number in the header.

Signing it on the kitchen table

The quote that closes is the one the customer accepts while the reasons are fresh. Go through the options on the tablet, mark the one you recommend, and ask for the signature and the deposit before you leave. A signed quote with a deposit is a scheduled job. An emailed PDF is a conversation that may or may not continue.

If they want to think about it, send it by text with a link so it's in their hand, and let the follow-ups run on the valid-until date. Print it from this page, save a PDF from the print dialog, or download the file for Word or Pages and keep a master with your business details filled in.

When the template stops being enough

The live version in General Dispatch is this document, created from the job in your brand, with the options laid out and the one you recommend marked. The customer opens it from a text, picks an option, signs with a typed or drawn signature, and pays the deposit by card on the page into your own Stripe account. The signature is recorded with the name, time, device and the exact version signed, the state notices shown are kept with it, and the job moves to scheduled. Quotes that go quiet get a polite follow-up until the valid-until date. It's part of the $97 a month business plan, and it reads exactly like the sheet below.

The template

Fill it in right here, then print it or open it in Word.

Click any line to type, pick your color, drop your logo in. Amounts add up on their own; type a percent in the tax line. It stays in your browser.

Click any line to type. It stays in this browser.

[Company Name]
[Street address, City, State ZIP]

[Phone]

[Email]

License # [________]

Quote

Quote

Quote number 
Date 
Valid until 
Prepared by 

Customer and property

Customer 
Property address 
Phone / email 
Job 

Scope of work

[What will be done and where, by area or system, in the words the customer used. Each item on its own line.]

Options

OptionWhat's includedPrice
Good  
Better (recommended)  
Best  

Included in every option

[Permits, haul-away of old equipment, startup and test, cleanup, the warranty.]

Not included

[Electrical by another trade, drywall or paint repair, anything found once the work is open; priced as a change order.]

Option selected 
Sales tax (as your state applies it) 
Total 
Deposit due on acceptance 
Balance due on completion 

Terms

This price is fixed for the scope above until the valid-until date. Changes to the scope are priced and approved in writing before the work.

Deposit due on acceptance; balance due on completion unless a payment schedule is written above. Work starts within [__] days of acceptance, weather and parts permitting.

Labor is warranted for [__] months. Parts and equipment carry the manufacturer's warranty.

Notices

[Your state's required language for home-improvement contracts, and the three-day cancellation notice for sales made at the home.]

Acceptance

Option accepted: [ ] Good [ ] Better [ ] Best

Customer: ____________________ Date: __________

[Company Name], by: ____________________ Date: __________

A starting point, not legal advice. Contract rules differ by state, so have your own attorney look it over before you use it.

Questions

What people ask.

What should a quote include?

Your business details and license number, the customer and the property, the scope of work by area, the options if you offer them with the recommended one marked, what's included in every option and what isn't, the fixed price with tax, the deposit and when the balance is due, a valid-until date, the terms (changes, schedule, warranty, cancellation), your state's required notices, and a place for the customer to accept. If something would be a surprise on the day, it belongs on the quote. The shorter and plainer the words, the more likely it gets signed at the table.

How do you quote a job?

See the job first so the scope is settled; a quote on an unseen job is an estimate with the wrong heading. List the work by area, price the whole scope from your price book or your hours and materials, and build two or three options around it so the customer chooses between your versions. Add what's included, what's not, the deposit, the valid-until date and the terms. Go through it with the customer while you're there and ask for the acceptance and the deposit before you leave.

Is a quote legally binding?

Once the customer accepts it, yes: an accepted quote for a defined scope at a fixed price is a contract, and both sides are bound by what's on the page. Before acceptance it's an offer you can withdraw, and after the valid-until date it lapses. A signed quote is the cleanest evidence; a text saying "go ahead" also counts in most states. That's why the scope, the exclusions and the change-order rule need to be written down before anyone signs.

How long is a quote valid for?

As long as it says, which is why it must say. Thirty days is the usual term for a project quote; shorter when equipment prices are moving or your schedule is filling fast. Write the actual date rather than "30 days" so there's nothing to compute, and use it as the reason for your follow-up text a week before it expires. After the date, the price is no longer a promise, and a customer who comes back gets a fresh quote.

What is the difference between a quote, an estimate and a proposal?

An estimate is an approximate price that can change once the work is open, and it says so. A quote is a fixed price for a defined scope, good until a date, binding once accepted. A proposal is a quote with the selling built in: the options laid out, the reasons for the recommended one, the company's credentials, and the acceptance on the last page. Service repairs are usually estimated; installs and projects are quoted; bigger projects get a proposal.

Is a signed quote a contract?

Yes. A quote the customer signs, for a defined scope at a stated price, is a contract for that work, and the terms on the page are its terms. That's the point of asking for the signature rather than a nod. It also means the notices your state requires on home-improvement contracts need to be on the quote before it's signed, not sent afterward. Keep the signed copy with the job; the live version records the name, time, device and exact version signed for you.

Send this one as a link and get paid on the page.

In General Dispatch the same document is created from the job, texted or emailed as a link, signed or paid by card right there, and chased politely until it is. $97 a month, free to set up.

See pricing